MICROSIMULATION-BASED EVALUATION OF ROUNDABOUT AND SIGNAL-CONTROLLED ROUNDABOUT PERFORMANCE UNDER MIXED TRAFFIC CONDITIONS IN DHAKA /

Saved in:
Bibliografiske detaljer
Hovedforfatter: Istiyaque, Md. Arif
Institution som forfatter: Supervised by Maj H. M. Imran Kayes (Instructor, Class-B, Dept of CE, MIST, Dhaka)
Andre forfattere: Raheem, Abdullah Rashid Hasan, Fatema, Mst. Kaniz
Format: Bog
Sprog:engelsk
Udgivet: Dhaka : CE DEPT. MIST, c2026.
Fag:
Tags: Tilføj Tag
Ingen Tags, Vær først til at tagge denne postø!

MARC

LEADER 00000nam a22000007a 4500
001 TP-3331
003 BD-DhMIS
005 20260825103722.0
008 260825t2026 bg a|||| b||| 000 0 eng
040 |a BD-DhMIS  |c BD-DhMIS  |d BD-DhMIS 
100 |a Istiyaque, Md. Arif  |9 1681 
245 |a MICROSIMULATION-BASED EVALUATION OF ROUNDABOUT AND SIGNAL-CONTROLLED ROUNDABOUT PERFORMANCE UNDER MIXED TRAFFIC CONDITIONS IN DHAKA /  |c Md. Arif Istiyaque, Abdullah Rashid Hasan Raheem, Mst. Kaniz Fatema 
260 |a Dhaka :  |b CE DEPT. MIST,  |c c2026. 
300 |a xxii, 129p. :  |b ills. ;  |c 29 cm. 
504 |a Includes bibliographical references. 
541 |e TP-3331 
650 |a Civil Engineering.  |9 1682 
650 |a This Thesis Paper of CE in BSc Program.  |9 1683 
700 |a Raheem, Abdullah Rashid Hasan  |9 1684 
700 |a Fatema, Mst. Kaniz  |9 1685 
710 |a Supervised by Maj H. M. Imran Kayes  |e Instructor, Class-B, Dept of CE, MIST, Dhaka  |9 1686 
942 |2 ddc  |c TP 
952 |0 0  |1 0  |2 ddc  |4 0  |6 3331_000000000000000_CE_B_SC_2026  |7 0  |9 88734  |a MISTCL  |b MISTCL  |d 2026-08-24  |e Department of Civil Engineering   |l 0  |o 3331 CE B.Sc 2026  |p TP-1010003331  |r 2026-08-25 10:39:48  |t 1  |w 2026-08-25  |y TP 
999 |c 12744  |d 12744